Preserving Our Past
                      To Build Our Future...
 
 

Washington Economic Development Project

Improvements Plan

  1. District Character and Quality
    • historical style decorative street lighting with banners, poles, and electrical outlets
    • special district entrance and identification signage
    • concrete pedestrian walkways with decorative brick accent paving
    • historical style street furnishings (e.g. benches, bollards and trash receptacles)
    • upright canopy street trees and landscape plantings
    • Main Street mast arm traffic signal system with historic style decorative poles
    • "North End District" people place with special paving, lighting, landscaping, signage and furnishings
    • Main and Beau Street intersection with decorative brick crosswalks, special accent paving and curb extension mini-parks

  2. Infrastructure/Parking
    • concrete curbs, gutters and handicap access ramps
    • utility modifications including catch basins, manholes, water service connections and underground conduit for street lights, traffic signals and electrical service cable
    • disposition of basements and voids under sidewalks
    • asphalt street resurfacing
    • parking spaces added to Main Street between Chestnut Street and Beau Street

« Back to WEDP Page